Structure
• Isolated RCC Footings Complying with Seismic III Zone, as per the Structural Consultants Advice.
• RCC Frame Structure with Brickwork Partitions. Concrete Grade and Steel Grade as per Structural Consultants Advice.
• The Height of Each Floor Shall be 3.0m Floor to Floor.
Flooring & Tiling
• Lift Lobby and Fascia Wall & Floor using Granite / Marble, as per the Architect's Design
• Staircases: Marble / Granite with Glass Hand Rail.
• Car Park Area: Grano Flooring with Grooves.
• Foyer / Living / Dining: Italian Marble with Matching 4" Skirting, As per the Architect's Design.
• All Bedrooms: Laminated Wooden Flooring with Matching 4" Skirting.
• Kitchen: 2' X 2'Vitrified Tiles from Asian / Somany / Kajaria and Wall Dado up to 2' Height.
• Toilets: Ceramic Tile Concepts 60cm X 60cm for Floor and 60cm X 30cm for Walls up to False Ceiling Height.
• Utility Room: 60cm X 30cm Ceramic Tiles for Floor and One Side Washing Wall up to 4' Height.
• Balconies / Open Terraces / Decks: Rustic /Anti skid / Ceramic Tiles 60cm X 60cm.
• Counter Granite : Kitchen and Toilet Washbasin Counter Top shall be Black Galaxy / Equivalent.
Sanitary & Plumbing
• Sanitary Fittings: EWC Wall-Hung and Wash Basins using Roca / Toto or Equivalent make, Concealed Cisterns Gebrit / Roca /Toto or Equivalent Make. (Colour: White)
• Faucets: Shall be Single Lever Concealed Diverters Brass with CP Finish, Heavy Body Metal Fittings of Roca / Grohe or Equivalent Makes. Provision for Hot & Cold Water Connection Shall be Provided for Overhead Showers, Wash Basins and Kitchen Sink. Health Faucet also shall be Provided in all Toilets.
• Plumbing: All Water Supply Lines shall be in ISI Marked CPVC pipes. Drainage Lines and Storm/Rain Water Drain Pipes shall be in PVC
• Kitchen & Service Area: Floor Mounted Faucets / Taps using Roca or Equivalent shall be Provided.
• Utility: Washing Machine Provision shall be Provided.
• Carysil Sink Single Bowl with Drain Board Shall be Provided for the kitchen.
Doors & Windows
• Window Shutters:Powder Coated Aluminium Openable / Sliding Windows with 12mm Toughened Glass shall be Provided.
• All Doors Shall be of 7'0' Height.
• Door Frames: Main Door Frame shall be of European Steam Beech Wood and Shutter with Veneer. 50mm Thick Both Faces Teak Veneered and Melamine Finish.
• Internal Door: All Internal Door Frame shall be of European Steam Beech Wood and Shutter with Veneer. 40/35mm Thick Both Faces Teak Veneered and Melamine Finish.
• Hardware: All hardware shall be in C.P Brass, Tower Bolts, Door-stoppers, Hinges. Locks shall be, Mortise from YALE make or Equivalent.
Electrical
• Concealed Copper Wiring using Polycab / RR Cables or equivalent make with Modular Plate Switches, Centralized Cabling System for all Electrical and Communication Requirements.
• Wiring Shall be done for Lighting, 5 Amps, 15 Amps and AC points in the Apartment.
• Switches: All Switches Shall be Legrand / Panasonic or Equivalent make, which will be Adaptable to Automation.
• Generator: 100% Backup Power is Provided Except 15 amps.
• Adequate ELCB and MCB shall be Provided in Each Apartment.
• Provision for Heat Pumps and Fresh Air Fans Shall be Provided for all Toilets and Kitchen. Heat Pump shall be Installed at an Additional Cost.
• Provision for Telephone, Data, DTH shall be Provided and Centralized Cabling for Multi DTH, Internet Systems also shall be Provided in the Living Room and All Bed rooms.
• Light Fittings would be Provided for Common Areas.
• Provision for EV (Electrical Vehicle) Charging Point in the Designated Parking Lot.
Ceiling Treatment
• Two Coats of Oil Bound Distemper Paint shall be Applied in the Common Areas, Utility, Service Areas
• False Ceiling for Common Lobby and Common Areas shall be Provided as per Architect Design.
Wall Treatment
• Internal Walls: POP Punning with Emulsion Paint.
• Service area: Premium Emulsion.
• External Walls: Whether Shield / Equivalent Exterior Grade Emulsion /Cladding/Texture Finish.
Automation
• Access Control Entry with Video Door Phone.
• Automatic DG Change over Facility for all the Apartments.
• Water Level Controller - Treated Water to the Overhead Tank.
• Multi-Level Security System for Common Areas and Lobbies Using CCTV with DVR Facility for 30 Days.
• Pneumatic / Pressure Boosting Pumps Shall be Provided for Pressure Water Supply for all the Apartments.
• Automated Entrance Gate Shall be Provided.