STRUCTURES
• RCC Framed Structure Designed For Zone III Earthquake Resistance.
• Masonry In AAC Blocks And Finished With Cement Plaster On The External And Gypsum Plaster On The Internal. Conformed – IS Code 2185 Part 3 Specification.
JOINERY
• Polished Teakwood Main Door Frame With Designer Flush Door Shutter Fitted With Branded Mortise Lock.
• Paint Finished Hardwood Frames With BWP Grade Flush Shutters For Bedrooms And WPC Doors For Toilets.
• Glazed UPVC Windows.
FLOORING
• 2’ X 2’ Vitrified Tile Flooring In All Rooms And Toilets With 1’ X 1’ Antiskid Ceramic Tile Flooring.
• Glazed Tile Dadoing Upto A Height Of 7’0” In Toilets And Up To A Height Of 2’0” Above Kitchen Counter.
• Black Granite Kitchen Countertop With Single Bowl Single Drain Stainless Steel Sink.
FINISHING
• Internal Walls Finished With Two Coats Of Emulsion Paint Over A Coat Of Putty And Primer. Colour As Recommended By Our Architects.
• External Walls With Two Coats Exterior Grade Emulsion Over A Coat Of Primer. Colour As Recommended By Our Architects.
• Common Areas Finished With Matt Finished Vitrified Tiles Or Natural Stone As Designed By Our Architects.
• White Glazed Sanitary Ware ( EWC And Wash Basin) In All Toilets Of Hindware Or Equivalent Make.
PLUMBING
• Concealed Internal Plumbing With CPVC Pipes Fitted With Brass Chromium Plated Plumbing Fixtures Like Wall Mixers, Pillar Cocks, Angle Valves, Etc.. Of Metro Or Equivalent Make.
• Ground Water Supplied Through Sump, Overhead Tank Through A Network Of CPVC Pipes.
• Drainage Through UPVC Pipe System Connected To A Sewage Treatment Plant.
ELECTRICAL
• Concealed Three Phase Copper Wiring, With Ample Points Connected To A Distribution Board Terminated Through Aluminium Cables To A Panel Board In The Ground Floor.
• Provision For Inverter For Light/Fan Points.
• All Common Areas With Three Phase Copper Wiring, Connected To A Separate Meter.