Structure
• RCC framed structure
• Structure complaint with seismic zone III
• Stilt floor raised 2.5 feet from road level • Concrete block masonry & plastering
• 8" outer wall thickness & 4" inner wall thickness
• Pest & Anti-termite control treatment prior to and during construction
Plumbing / Water System
•Ring main water system with CPVC pipes for water lines
•PVC pipes for drainage & rainwater lines
•UG sump with adequate capacity
•Overhead tank with metro & bore partition
• Rainwater harvesting system
• Borewell - 2 no
Electrical
• 3-Phase power supply with fully concealed fire resistant wiring
• Generator backup
• Common Areas - lift, lighting, pumps, and motors
• Apartments - lights, fan & 5amp points.
•TV, telephone & data points provisions in living area
• AC points provisions in living, dining & bedrooms
• Switches - Anchor Roma or equivalent
• Solar Panels installed in the terrace floor for Common area as per CMDA regulations
• EV charging provision for all apartments in respective parking slots
Security
• Security booth at entrance gate
• CCTV for common areas
• Video door phone access
Toilets
• Wall tiling up to 7ft height
• Sanitary & CP fittings - Jaquar / Equivalent
Windows & Ventilators
• UPVC sliding windows with plain glass
• MS Grill for windows
Flooring
• Vitrified tiles in living, dining, bedrooms & kitchen Anti-Skid tiles in utility, toilets & balcony
• Kota stone/granite/equivalent for common area & staircase
Painting
•Ceiling & Internal Walls-2 coats of emulsion paint over wall putty & primer
•Exterior walls - weather shield exterior emulsion paint
• Enamel paint for grills & railings
Doors
•Main Door - Teak wood frame & shutter
• Internal Doors - Country wood frame & skin door shutter
• Smart lock for main doors
Kitchen & Utility
•Open floor will be provided with necessary electrical and utility provisions for easy customisation Lift (Elevator)
• Johnson/Equivalent 10-passenger elevator with automatic door closing mechanism & rescue device