Structure:
Two Stilts and 16 or 17 storey RCC Framed Structure
Car Parking:
Open/ Semi – Covered car park in Lower Stilt and Upper Stilt level.
Foyer/Living/Dining/Passage:
Vitrified/ Ceramic tile flooring and skirting.
Plastic emulsion paint for walls and ceiling.
Bedroom:
Vitrified/Ceramic tile flooring and skirting.
Plastic emulsion paint for walls and ceiling.
Toilet:
Ceramic Tile flooring.
Ceramic Tiles for walls up to False Ceiling.
False Ceiling with grid panels.
Granite counter top in all toilets except Domestic Help toilet.
Kitchen:
Ceramic Tile Flooring.
Ceramic wall Tiling up to ceiling.
Plastic emulsion paint for ceiling.
Balcony / Utilities:
Ceramic Tile Flooring and skirting.
Granite coping for parapet / MS Handrail as per design.
Plastic emulsion paint for ceiling.
False ceiling wherever applicable.
All walls painted in textured paint.
Common Areas:
Granite / Vitrified / ceramic / equivalent flooring.
Ceramic tile / Texture paint on walls.
Paint finish / False Ceiling as applicable for ceiling.
Granite coping for parapet / MS handrail as per design.
Staircase:
Concrete Treads and Risers.
MS handrail as per design.
Paint / Texture finish for walls.
Plastic emulsion paint for ceiling.
Joinery:
Maindoor:
Frame – Timber.
Architrave – Timber.
Shutters – with both side HDF skin.
Toilet Door:
Frame – Timber.
Architrave – Timber.
Shutters – with outside HDF and inside laminate.
All Other external doors to be manufactured in aluminium extruded frames / UPVC and shutter with panels.
Aluminium / UPVC glazed windows.
Lifts:
Lifts to reputed make.
Landscape:
Designer landscaping.
Plumbing and Sanitary:
Sanitary fixtures of reputed make in all toilets.
Chromium plated fittings in all toilets.
Electrical:
Power Connection to High wall Split Air Conditioning unit in Living and all Bedrooms.
Telephone point in living and Master Bedroom.
Television point in living and Master Bedroom.
Intercom facility from security cabin to each apartment with handset.