FOUNDATION
RAFT Foundation.
STRUCTURE
RCC framed structure.
SUPER STRUCTURE
8 thick outer walls and 4" thick partition walls - AAC blocks
JOINERYS
Main Door Teak wood frame with teak panel door fully polished.
Bed Room Door Teak wood frame with teak panel door fully polished
Toilet Door : Film coated doors.
Windows UPVC frame with glazed shutters
ELECTRICAL
Three phase electrical circuit. Branded wires, fixtures and switches as per standard in concealed PVC conduits. AC and Geyser provisions in all bedrooms and toilets respectively, Inverter Provision.
PLUMBING
Standard PVC and CPVC for all pipes lines. ISI Pipes for open waterline.
WATER SUPPLY
2 no's of deep bore well provided for ground water with underground sump.
PAINTING
Interior Wall:
Asian Tractor Emulsion or its equivalent & Wall putty (2 coats) Exterior Wall: Asian Apex Ultima or its equivalent
Other Doors:
Synthetic Enamel paints (2 coats)
FLOORING & WALL DADOING
Living & Bedrooms: 4'x2' Vitrified tile flooring.
Kitchen. : Black Granite counter with stainless steel sink, wall tiles above platform up to 2' feet.
Toilet : : 70" height glazed wall tile with Mat/ Anti-skid tiles for the flooring.
FITTINGS
Sanitary Fitting: Parryware or its equivalent. ICP Fitting: Parryware or its equivalent.
PARKING
Paving in parking area.
GENERAL
Tiles for staircase and lobby. SS Handrails for Staircase. Appropriate weathering coarse treatment in terrace. Rain water harvesting. Common overhead tank. Compound wall appropriate gates and common lighting wherever required. LIFT Branded lift with automatic door.