Structure
• RCC framed structure with pile foundation confirming BIS requirements
• Anti-termite treatment as per BIS requirements
• All Walls with Solid blocks set in cement mortar
• 6 "thick solid blocks for the outer wall and 4? thick solid blocks for all partitions
Wall Finish
• Cement Plaster and JK/Birla putty finish with Premium Emulsion Paint for all internal Walls
• External wall cement plaster finished with weather shield Max I Ace Exterior Emulsion
• The Toilet will be finished with glazed ceramic tiles up to 7' height
• Toilet, Kitchen, Balconies, and other areas will be finished with cement plaster and emulsion
• 2 ft above the kitchen platform will be finished with glazed ceramic tiles
Floor Finishes
• Living, Dining will be finished with 4’0"*2’0" vitrified tiles with matching skirting and Bedroom & Kitchen will be finished with 2’*2' vitrified tiles
• Balconies and toilets will be finished with Non – slippery Ceramic Tiles
• Wash I Service Area will be finished with non-slippery Ceramic Tiles
• Ground Floor Lobbies and corridors will be finished with Granite
• The staircase will be finished with vitrified tiles
• Car park areas will be finished with Grand flooring
• The driveway will be finished with interlocking blocks
Doors & Windows
• Entrance Doors: Teakwood Frame with teak Veneered Flush Shutter. Godrej or Yale locks will be provided
• Bedroom Doors: Teakwood frame and moulded skin panelled/ laminated doors. Godrej or Yale locks will be provided
• Toilet Doors: Teakwood frame moulded skin panelled I laminated doors
• Windows: UPVC window with MS Grill as per design of the architect
• French Door: UPVC I Aluminium Sliding doors without grills
Ceiling
• All ceiling areas will be finished with 2 coats of Putty with emulsion paint
Kitchen
• 2" wide granite slab and a stainless steel bowl with drainboard sink would be provided
• Provision for chimney and Aqua Guard will be made
Lift
• The Building will be served with a 10 passenger lift of Johnson or Schindler
Toilets
• White European Water closet of Kholer I Parryware will be provided in all toilets
• All toilets will have provision for connecting a geyser
• Health Faucet, diverter with an overhead shower will be provided in all toilets
• All CP fittings will be of Jaquar/ Parryware
Electrical
• Concealed insulated Copper Multi strand Finolex I Polycab Fire resistance wires in all apartments
• Each Apartment will be provided with a distribution board having MCB’s
• All switches & sockets of Legrand I Anchor
• DG backup will be given for common facilities like pumps, lifts, STP, etc
Security
• Provision will be given for intercom connection to the security
• Provision will be given for CCTV cameras in the stilt lift lobbies, entry and exit gates
Common Toilet
• Common Toilet for drivers and domestic help would be provided in the stilt floor
Compound wall
• 5 ft height compound wall on all the sides of the plot
sump
• An underground sump of adequate capacity will be provided
Rainwater Harvesting
• Will be provided as per the requirements of CMWSSB norms