Structure
RCC Frame structure with isolated column foundation designed for seismic loads Superstructure with RCC slab, beam and brick masonry wall.
Proper antitermite treatment shall be provided at ground floor plinth level.
One side loft and one shelf unit will be provided in each kitchen and bedroom.
Floor Finishing
Living, Kitchen, dinning, bed room, Balcony Floors will be provided with 600x600 mm (2'x2') size vitrified tiles with 100mm high skirting. (As per builders choice)
Toilet, will have matt finish ceramic tiles. (As per builders choice)
Staircase tread, riser landing and lobby will be provided with Antiskid ceramic tiles
Car parking and walk ways will be provided with Antiskid ceramic tiles
Roof terrace will be provided with weathering course and red tiles
Wall & Ceiling Finishing
Kitchen will have 4' height ceramic tiles wall dado above the platform with polished granite will be provided as platform counter top with stainless steel kitchen sink.
Toilet walls will have 7" height glazed designer ceramic tiles. (As per builders choice)
Rest of the interior walls shall be decorated with 1 coat of white cement & primer, 2 coats putty and emulsion paint. (As per builders choice)
Exterior wall will receive 2 coats of exterior emulsion paint. (As per builders choice)
Doors & Windows
Main door shall be teak wood frame with teak finish flush door
Bed Room doors shall be in country wood frame with compress flush door
All the other Bathroom doors will be pin P.V.C
Windows shall be U.P.V.C door with openable glazed shutters and MS grill protection
Ventilator shall be Country frame with glass louvers and MS grill protection
Metal Works
Staircase shall be provided with 3' height SS grill railing.
MS grill gate shall be provided in the car parking area.
Plumbing & Drainage Work
All the toilets shall have shower point with hot, and cold water wall mixer, .1 wash basin and white color EWC/IWC (As per Builder Choice)
All the sanitary wares shall be ISI Quality or equivalent
Kitchen shall have stainless steel sink with drain boards and a separate tap for bore and metro water
Overhead tank shall be with RCC structure
Electrical
Three phase power connection for each apartment from TNEB with concealed wiring and phase changer shall be provided.
All switches and sockets shall be modular style or equivalent.
All electrical wiring & cabling shall be Orbit make or equivalent.
PVC conduits with pull wire shall be provided for TV and Telephone outlets.
All other necessary points will be provided in all the rooms and in common area.