Structure
R.C.C framed structure.
Foundation – Designed for Ground + 2 floors Brick/AAC/ – Best quality blocks 8 “ for exterior walls & 4 “ for interior walls.
Ceiling plastering.
Inner and outer plastering.
Joineries
MAIN DOOR – First quality Gana teak / Paduk wood frames. Veener shutters with brass fittings and branded locks.
OTHER DOORS – Gana Teak / Paduk wood frame with panel skin flush doors with necessary fittings or Pre-Hung Doors.
BATHROOM DOORS -Water proof flush doors with fittings.
WINDOWS – UPVC windows with necessary opening – MS grill provided with 4mm plain glass.
VENTILATORS – Aluminum louvers with MS grill & exhaust fan provision.
Flooring
Living, Dining, Bedrooms, and Kitchen will be provided with 4’0”x 2’0” branded vitrified tiles.
One Master Bedroom, wooden finished flooring.
Balcony and Service will be provided with 1’0”x1’0” branded Anti-skid tiles.
Toilets
Floor – Anti skid ceramic tiles.
Wall – dadoing ceramic tiles for 7’ht from floor.
Electrical
PROVISIONS FOR ELECTRICAL POINTS
Concealed wiring with FR Wires – Poly cab or equivalent.
All switches are legrand / Anchor or Eq.brand.
3phase electric supply with change over facility.
FOYER – one bell point, one light point(2way).
Living & Dining – one TV point, one telephone point, one AC Point, three wall point, two fan point, chandelier point, three 6Amp, one 15Amp sockets at suitable place.
BEDROOMS – two wall point, one fan point with 2way, two 6Amp, one AC point.
KITCHEN – two wall point, one fan & exhaust fan point, two 6Amp point for mixer & Grinder, two 15Amp points for water purifier & micro oven.
All TOILETS – one light point, one 15Amp point for water heater, One 6Amp point and one point for exhaust fan.
UTILITY AREA – one wall point, one 15amp.
CORRIDOR – necessary ceiling points.
BALCONY – one light point.
DECK AND KITCHEN AREA – two light point each.
TERRACE – two light point.
PLUMBING & SANITARY WARES
KITCHEN
One line for water purifier.
SINK – Two Sink taps.
TOILETS
EWC will be provided with Hindware / Kohler / Roca.
Hot & cold water provision.
Health faucet & Angle Cock for closet line.
Wash basin tap point.
All internal pipelines are CPVC and externals are PVC.
DINING UTILITY
Pipeline & waste water provision for washing machine.
PAINTING
CEILING
Smooth Putty Finish with 2 coat paint.
INNER WALL
White cement based putty 2 coats.
Primer 1 coat.
Emulsion Paint with roller finish – 2 coats.
OUTER WALL
Polished with natural melamine finish.
OTHER DOORS
Primer 1 coat, enamel paint 2 coats.
MS GRILL
Enamel paint 2 coats.
Covered car parking
Flooring as per design.
Electric Car Charging Point.
STAIR CASE
FLOORING
Steps and Landing with granite.
HANDRAIL
Handrails SS.
OPEN TERRACE
Parapet wall for 3’6”ht.
Weathering course finished with lime and brick coba / lime tiles with necessary slope to drain rain water.
Top finished with weathering course tiles / lime tiles.
SPECIAL AMENITIES
Pest control treatment.
Project name in metal letters.
Elevation as per design.
Vaastu Compliant.
Waterproofing in Toilets.
Rain Water Harvesting.
DG for Clubhouse.
CCTV Camera.
Power back-up for villas.